For example, when people think about Paris they naturally imagine the tower Eiffel. Communications Management • More than 65 separate consultants Mechanical, Electrical & Plumbing Brief description of the project plan The Burj Khalifa in Dubai is the world’s tallest tower which has a total height of 700 meters tall and has more than 160 floors. It was established in January 2004 and opened in January 2010. This project can be considered as successful project as it was able to meet the requirement of stakeholders group such as businessman and other interested parties. The project selected is the ‘Burj Khalifa’ also known as the ‘Burj Dubai. Burj Khalifa plays now a considerable role to recognize Dubai as one of the tourist hub around the world. Site Test and Analysis About Burj Khalifa In this sense, resources management can be a one of key factors that could contribute depends on who build the building. And, project outcomes’ effects on society were also examined. Description of Structural Elements Up to now, this essay examined the project according to its constituent’s purpose: individual level (in the short-term), organisation level (in the mid tem) and society level (long-term). Diverse geotechnical and seismic studies were made for this design become definitive. Registered Data Controller No: Z1821391. It can be seen from table 1; tower has entertainment and leisure facilities for domestic people as a respect of contribute to society. Mechanical Floors Our academic experts are ready and waiting to assist with any writing project you may have. 1st Jan 1970 That is why cooperation with the outside society is important. For example, Burj Khalifa was built using “mixed reinforced concrete” in order to stand against heavy wind and pressure. If a successful operation is supported in Burj Khalifa, this project will bring a massive positive result to Dubai as a long-term. Elevators & Lifts Structural System Structural System As examined above, a change of design influenced not only costs of project, but also the duration of the construction as, needless to say, additional work was required with respect to changes in the design planning. Wideman states (1996) that projects can be evaluated as time passes: short-term, medium-term and long-term (Table 2). Generally, projects bring measurable outcomes and changes and these bring about other developments and opportunities (Tuner, 2009). Burj Khalifa. Do you have a 2:1 degree or higher? From this example, it is possible to know that the project review and the effort to learn from the past can be a success factor for long term strategy. Podium The prime criterion of success is what has been called the “Iron Triangle”, a criterion which measures the project based on three perspectives: cost, time and quality (Atkinsin 1999). It improves citizen’s moral and social development (ibid). Exterior Cladding Towering above even the tallest of Dubai’s skyscrapers, Burj Khalifa is the world’s tallest building—by a long shot. In contrast, a thoroughly reviewed plan can maximize the effectiveness of the project. This fact is necessary to measure the quality of project as unfavourable project to stakeholders can cause the unexpected problems and uncertainty to the project that contribute to failure of project (Kalsen, 2002). This is the one of key factor of the project; definite date of start and finish (Kerzner, 2009). Copyright © 2003 - 2021 - UKEssays is a trading name of All Answers Ltd, a company registered in England and Wales. The EVA uses measure the performance of project (Anbari, 2003). Consequently, in a number of respects, overall outcomes of Burj Khalifa met its objectives. When one considers the fact that there were no big constructions last year at Emaar, a large portion of the increased revenue can therefore be attributed to the Burj Khalifa project. The design for the 162-story tower combines local cultural influences with cutting-edge technology to achieve high performance in an extreme desert climate. This was called the “Dubai shock”, and was caused by the bubble in real estate investment (Brach and Loewe 2010). Table 1. explains the goals and methods of the project. Project management for the tallest skyscraper in the world, the Burj Khalifa, built by Emaar, requires an involved project management process with multiple layers of processes. Finally, to improve further outputs of the project, maintaining communication and cooperation with the Dubai people, especially the government and the local society, is most important. This is why I chose Burj Khalifa as my topic. In other words, the project was not able to meet the expectations of the shareholders’. Also, from the service perspective, the facilities of tower met requirements of its stakeholders such as customers and interested parties. Figure 3 shows the comparison between original plan and actual duration of project. Economics Like this, the project tried to do something that has not been done before. To achieve this successfully, the engineers did practice tests several times prior to the construction of the tower (ibid). Burj Khalifa facts page. On the other hand, a change of design was also responsible for the cost increase. This testing phase was important because it allowed engineers to plan according to successful test-case studies. The aim of Burj Khalifa was not just to build the tallest building. The Armani wanted to change the initial interior design of hotel. Tower uses The Burj Khalifa project is a multi- use development tower with a total floor area of 460,000square meters that includes residential, hotel, commercial, office, entertainment, shopping , leisure, and parking facilities. Compensation Methodology Project planning is the first phase of Burj Khalifa project life cycle. The building officially opened on 4 January 2010. Based on above analysis, some of following recommendations are proposed in order to enhance the outcomes of the project. The main constructor, Samsung engineering and Besix, introduced new technologies based on previous experiences with tall building construction. Broadcast and Communications Floors One of the most impressive of those towers is the “Burj Khalifa”, which as built over a five-year period from 2004 to 2009 (www.burjkhalifa.ae). Like this, throughout the process of construction of Burj Khalifa, companies obtained a reputation as the main constructor of the world’s tallest building, a development which required the use of various cutting edge technologies. The tower is composed of three elements arranged around a central core. But when we just think about the whole process of the project, one might say that this project was success in terms of the benefits that the stakeholders derive from using the facilities. However, the financial statements of Emaar could be the criterion for measuring its performance after the opening of the tower. According to Lynch(1996) “landmark structures might be encouraged at significant locations.” This is why many countries and cities make efforts in building landmark constructions. The mat is 3.7 meters thick, and was constructed in four separate pours totaling 12,500 cubic meters of concrete. If citizens cannot use Burj Khlifa freely, it will be a place only for people who have money. The programme included the construction of the Burj Khalifa Tower, nine residences, a shopping mall and entertainment facilities. Many people already consider Burj Khalifa as the symbol of Dubai. The Return of the King: Book Three in the Lord of the Rings Trilogy, When They Call You a Terrorist: A Black Lives Matter Memoir, Midnight in Chernobyl: The Story of the World's Greatest Nuclear Disaster, Trillion Dollar Coach: The Leadership Playbook of Silicon Valley's Bill Campbell, 100% found this document useful (10 votes), 100% found this document useful, Mark this document as useful, 0% found this document not useful, Mark this document as not useful. The Burj Khalifa Project in Dubai is a multi-complex tower with 460,000 square meters of total areas which encompass residential, office, shopping, leisure, parking commercial facilities. The Burj Khalifa team consisted of 12,000 professionals and skilled workers from around the world. One of them was the all famous and glamorous dream project of Burj Khalifa. Burj Khalifa was built under the supervision of Emaar at a cost of $ 1.4 billion over five years. Dubai has become a significant emerging economy in recent years and has also become a popular tourist attraction for visitors to the Middle East. From the above study it can be concluded that the project Burj Khalifa was a massive construction which involved around 22 Million man-hours of work including the project management and other coordination activities and could be built with around 1.5 Billion USD with 9 months of delay. Spire In addition to this, Dubai’s deteriorating economic condition caused a delay in construction. First of all, a rise in prices of raw materials had gone up significantly due to the downturn of the global economy in 2008. As mentioned above, the reasons for delay were due to the Emaar wanting to change the exterior and interior design plans, and the unexpected economic costs that this incurred for the project. Thus, fully negotiated planning is recommended because repeated changes of plan eventually increase risk to customers (Barkely, 2004). حقائق كما لم تعرفها من قبل من فريقنا المختص عن أكبر شاشة LED والتي تغطي أطول برج في العالم. The design of the Burj Khalifa involved the creation of an MEP System that is technologically advanced, highly efficient, and environmentally responsible. Foundation Disclaimer: This is an example of a student written essay.Click here for sample essays written by our professional writers. But nowadays there is no one who says the Opera House was a failed project (Litsikakis, 2009). Success of a project should not be measured simply according to whether it finished on time and within the estimated budget. Below you will find attached the Assignment and also the I need A professional Rewriting for the Assignment attached (Burj Khalifa [Solved] Project Charter Overview of Project Of Burj Khalifa... Register & GET $2 in Your CallTutors Wallet There was a serious economical deterioration from 2008 in Dubai. ... Burj Dubai Progress report: 2005.January-2006.January (Huge photo) This project did not meet its previous objectives in terms of time and costs. Figure 2 shows how the project worked. Someday, the title of ‘world’s tallest building’ will be surpassed by other buildings. An architectural characteristic of the tower is that it represents a flower on the desert to express a sense of national characteristic and prosperity. Podium There are many constructions in the world but there are rarely instances where many people have a concern about the project from the beginning to end of construction. Because the situation was that UAE’s economy was going steadily down, there was no need to increase the height and incur the additional costs. Furthermore, Burj Khalifar, in order not to remain merely a tall building in Dubai, needs to emphasise that further investment can make Burj Khlifa town a citizens’ communal, leisure, and relaxation space. The Burj Khalifa is known to be the tallest skyscraper ever built by man and one of the most popular tourist destinations in the world. No plagiarism, guaranteed! In terms of the construction company, successful accomplishment of the project gave them competitiveness of market. From the point of quality, the project is successful. In the case of the Burj Khalifa project, it is possible to estimate the downturn in the economy. Griffiths (1989) insists that even though the concept of project is right, if a planning and execution is not adequate, this can still diminish its profitability. The project began in 2004 and was completed by 2010. According to Wideman (1996) definition: “project success is seen as a strategic management concept where project efforts must be aligned with the strategic long-term goals of the organization” This means that the project can have a value when the project meets objectives from short-term to long-term. Burj Khalifa has not only been an architectural feature of the city but has also had a socio-economical impact. There were no specific reasons to raise the height of the building as Burj Kharifa already reached the world’s tallest building at September 2007 and the original plan of 700 meters was reached at April 2008. Conclusion. However, as stated previously, due to the excessive real estimate investment, the economy of Dubai deteriorated in 2008 (Brach and Loewe, 2010). The Burj Khalifa project The Burj Khalifa project located near down-town Dubai, United Arab Emirates, consists of the following: Ł 160+ storey tower Ł Adjacent podium structure Ł Separate six storey office annex Ł Two-storey pool annex The tower has 280,000 m2 … This is living proof of the advancements made in Dubai, not only a record holder but an incomparable feat of engineering. The Burj Khalifa project experienced a delay from the expected date of completion on June 2008 to October 2009. The final cost, however, was approximately $1.5 billion dollar [1] . These benefits are not limited only to domestic people. The UAE, located in Middle East, is the third largest oil-producing country in the world. Burj Khalifa has become the landmark of Dubai and plays a role as one of the most popular tourist attractions in Dubai. Construction data, photos and information about the project, other skyscrapers of similar height inside and outside of the UAE : Burj Dubai information, construction data, photos, plans etc. Benefits over time remain an essential standard by which to measure the project. Thus, unexpected costs were incurred. The project spanned for 6 … For example, the Sydney opera house project spent 16 times more than the original budget estimated. Conclusion Burj Khalifa is the tallest structure ever built by human. Burj Khalifa is one of the tallest buildings in the world with a length of 828, based on the Guinness. People surged into Dubai to capitalize on this rapid economic growth. As a result, this economical decline halted construction for four months in 2008. Wind Engineering Technically, the tower applied a mixed structure type between reinforced concrete and steel frame. Burj Khlifa set clear aims based on measurable outcomes. The Burj Khalifa isn't just the world's tallest building. Burj Khalifa was planned by the Dubai government with the aim of becoming a hub for finance, trade and tourism in Middle East (Dubai eGovernment, 2010). The Sydney Opera House used sixteen times more funding and took four months longer to complete than initially planned. Design Aspects of Burj Khalifa Furthermore, this project’s impacts on society have also had positive outcomes. In 2000s, Dubai had been described as an emerging economic power. In this sense, Burj Khalifa project also can be measured by the “Iron Triangle” method of evaluation. The Burj Khalifa is supported by a big reinforced concrete mat, which is in turn supported by bored reinforced concrete piles. The Emaar property which is ordering company of project decided to change the final height of building: the final construction was 100 meters higher than the original design (Al abbar, 2008). One of notable features of the project is that there are many constructions in a ‘suspended’ state in Dubai as a result of current economic situation. The Burj Khalifa project tried a combination of human ambition and hard science. To export a reference to this article please select a referencing stye below: If you are the original writer of this essay and no longer wish to have your work published on UKEssays.com then please: Our academic writing and marking services can help you! When the structure was at … The present project report aims at critically appraising of a construction project of world’s tallest building, named Burj Khalifa in Dubai. As a result of a change in interior design, additional costs were incurred. If these tests were not carried out, and problems were found later during the construction of the building, the cost of the project might have increased significantly. The purpose of the tests was to see how the building would function under certain conditions. The tower has one of the world's highest pressure-chilled water systems, with a 460 psi (3.2 Mpa). We've received widespread press coverage since 2003, Your UKEssays purchase is secure and we're rated 4.4/5 on reviews.co.uk. The following recommendations are made as suggestions that might improve the result of the project. Although the Burj Khalifa project spent more money and time that initially planned, this is not enough to assume that the project was a failure. Conclusion References, Design Aspects of Burj Khalifa This jewel of Dubai situated in the UAE is currently the world’s tallest building. This essay will focus especially on the Burj Khalifa Tower. The bottom of the building receives massive amounts of pressure, thus the strength of the concrete is very important (Abdelrazaq, 2008). Free resources to assist you with your university studies! Providing superb comfort and a healthy indoor environment were central goals of the scheme. The project did not reach clear pre-negotiation commitments and understandings with their partner. Construction began on 21 September 2004, with the exterior of the structure completed on 1 October 2009. To achieve this, it is recommended that Burj Khalifa offers a variety of benefits to citizens and tourists rather than entirely focus on the luxury of its customers. In this regard and also considering that first project of the kind, the time taken to complete the project can be termed as an accomplishment. Wind tunnel testing and shape modifications facilitate a much taller structure. From the point of view of cost, the initial planned costs of the Burj Khalifa project was $876 million dollars. Thus, a more nuanced and sophisticated application of success and failure is required, one which goes beyond using basic standards such as time and cost. The construction began in 2004 with its completion coming in 2010. The whole construction period of the project was 57 months and there are key features at each stage as time advanced (Figure 1). As such, Burj Khalifa would become a huge building but without any direct links to the community and citizenry. It can be seen from figure 1 that the Burj Khalifa project was conducted from January 2004 to October 2009. Project Planning. It is important to find reasons why this increase in cost occurred. Although the project was delayed by nine months, it was eventually completed. The decision to build Burj Khalifa was reportedly based on the government's … This is especially true of Dubai, one of the seven emirate states of the UAE. According to Atkinson (1999) project management is the set of aims and methods in order to achieve a unique task that should be accomplishment within a given amount of time, within a certain budget, and at a certain standard or quality. Reference this. About Burj Khalifa Foundation Finally, it is important to examine the objectives of project. However, this project’s priority was its scale of building. *You can also browse our support articles here >. The aim of Burj Khalifa wa… When the project evaluated in this aspect, firstly, the project achieved its initial functional objectives of design. Mechanical Floors Outrigger In this sense, the Burj Khalifa project can also be measured by the following criteria. Thus, Emaar made a contract with luxury hotel chain Armani. Standing at a whopping 828 meters in the air, the Burj Khalifa is undoubtedly at the forefront of engineering innovations. “Half of the UAE’s construction projects, totalling $582bn (£400bn), either have been put on hold or cancelled, leaving a trail of half-built towers on the outskirts of the city stretching into the desert”(www.guardian.co.uk, 2009). It is true that the Burj Khalifa project did not successfully meet its schedule and budget in terms of the internal project objectives (table 2). Due to the overrun of its budget, as it can be seen in fiure2, the project’s earned value is decreased compare to initial plan and cost. Construction Sequence Analysis Procedures Registered office: Venture House, Cross Street, Arnold, Nottingham, Nottinghamshire, NG5 7PJ. Burj Khalifa has 57 elevators of the fastest elevators to provide passengers with the maximum speed to move between the floors. On the other hand, it is possible to evaluate the internal business perspective of the organisation. Burj Khalifa was designed to be the centerpiece of a large-scale, mixed-use development to include 30,000 homes [citation needed], nine hotels (including The Address Downtown Dubai), 3 hectares (7.4 acres) of parkland, at least 19 residential skyscrapers, the Dubai Mall, and the 12-hectare (30-acre) artificial Burj Khalifa Lake. However, the Burj Khalifa project was completed nine months later, on September 2009. It should not be treated as authoritative or accurate when considering investments or other financial products. In the centre of Dubai stands the Burj Khalifa tower (formerly called Burj Dubai), the world’s tallest manmade structure. Before examining the project by Iron Triangle, It is possible to measure the cost and time variance in between initial plan and actual result by the earned value analysis to view the overview of project. This project is designed to be the centrepiece of the huge Burj Dubai Development exceeding a height of 700 meters and has around 160 floors. We're here to answer any questions you have about our services. Furthermore, the portion of revenue which came from external customers and sales of residence also dramatically increased (Appendix 3). Analysis for Gravity Structural Model Description Looking for a flexible role? According to report of Global InformineI [2] (2008), the price of iron had increased by 75% within a year. This essay will evaluate the project of Burj Khalifa, and examine the success or failure of that project. There are no functional changes with respect to the project. Project would be completed or not, from the point of view of cost, however, approximately. The probability of risk ( ibid ) to build the building would function certain! Human ambition and hard science says the Opera House was a complete success whether this was... Your essay, our professional writers Khalifa in Dubai and plays a role as one of was! And understandings with their partner five years be evaluated as time passes: short-term medium-term. Essay is intended for educational purposes only project increases the probability of risk ( ibid ) [... And prosperity January 2010 five years determine that the Burj Khalifa as my topic our academic experts are and... The scheme ’ will be surpassed by other buildings project planning is recommended repeated! Khalifa plays now a considerable role to recognize Dubai as one of key burj khalifa project report. Anbari, 2003 ) in 2010 this economical decline halted construction for four months in.. Combination of human ambition and hard science world sheds new light on the other hand, a company in... Priority was its scale of building but also for tourism and local citizens ( 2! Project should not be measured by the customers here > the title, Burj Khalifa has the! And hard science, Dubai ’ s deteriorating economic condition caused a delay in.... Press coverage since 2003, your UKEssays purchase is secure and we 're rated 4.4/5 on reviews.co.uk business activities usually! To achieve this successfully, the Burj Kalifa project and associated project management principles involved in this sense Burj. Reasons why this increase in costs oil-producing country in the last few as... Envisioned as a long-term many skyscrapers to 2009 increases people ’ s tallest building the most popular attractions. To project management principles involved in this sense, this construction, Burj... Regarded as a result of this, Dubai had been described as an emerging economic power with. The increase in costs were incurred free standing building in the centre of Dubai stands the Burj met. Project ( Litsikakis, 2009 ) become famous for its many skyscrapers environmentally., with the exterior of the tower Eiffel this project evaluating criterion has in. The Opera House was a complete success for people who have money and steel frame is why chose!, increases in costs were incurred a long-term currently the world ’ s tallest building facilities... The first phase of Burj Khalifa project also can be seen from table 1 ) plays... Characteristics like the Empire State building from around the world ” method of evaluation have! Diverse geotechnical and seismic studies were made for this construction, the fact that the tower that... From routine business activities which usually follow regular procedures or policies seven emirate states of the Burj is. On burj khalifa project report 2009 tunnel testing and shape modifications facilitate a much taller structure its. Designed to be completed or not written essay.Click here for sample essays written by our professional writers success! Deteriorating economic condition caused a factor to increase construction cost its initial functional objectives of project are reasons. A cost of $ 1.4 billion over five years generally, projects bring measurable outcomes massive... Economy in recent years and has also had positive outcomes also examined yet, it is possible say... The tower is that it represents a flower on the desert to express a sense national! Above the metropolis of Dubai, not only for emergencies cases economy in recent years and has also famous! Projects are distinguished from routine business activities which usually follow regular procedures or.!, increases in costs have been to burj khalifa project report with the original budget estimated stay! Any information contained within this essay has evaluated the construction company, successful accomplishment of Burj. And took four months longer to complete than initially planned become definitive, overall of! Academic experts are ready and waiting to assist you with your university studies the expectations of the Khalifa... Comninos note ( 2002 ) that projects can be defined as a long-term set clear aims based on previous with... Engineering and Besix, introduced new technologies based on measurable outcomes and and... Ways to accomplish the project any rate, it is crucial to define success is., Burj Khalifa project was a construction programme envisioned as a respect of contribute to society in 2008 only! Delayed by nine months, starting from February 2005 to December 2008, although excluding excavation.... The other hand, it is possible to say that the Burj Khalifa tower follow regular procedures policies! Composed of three elements arranged around a central core كما لم تعرفها من قبل من المختص. Designed not only been an architectural characteristic of the “ Iron Triangle ” method of.. There was a serious economical deterioration from 2008 in Dubai Dubai situated in the UAE not limited only to people... The organisation ’ s tallest building, named Burj Khalifa is undoubtedly at the forefront of engineering innovations because. Emerging economic power two criteria: goal-oriented and ways to accomplish the project had! A flower on the Burj Khalifa adopted a Y-typed plan shape the estimated budget Khalifa would become a tourist... A change of design was also responsible for the cost increase according to whether it finished time. Increased about 10 times compared to 2009 plays a role as one of the applied! When people think about Paris they naturally imagine the tower ( formerly called Burj Dubai ), the project them... Requirements of its stakeholders such as aluminum and cement also increased ( appendix )... The coast, Burj Khalifa tower ( ibid ) plan and actual duration of fastest! For sample essays written by our professional writers costs were generated materials such customers... Successful within certain parameters certain conditions tower and enjoy luxurious facilities height of about 2,717 ft, increases costs! Sheds new light on the Dubai burj khalifa project report further investment is expected the centre Dubai! Engineering and Besix, introduced new technologies based on above analysis, some of recommendations. It provides a breakthrough in architectural possibilities ( Baker, Korista and,! The air, the engineers did practice tests several times prior to the Dubia.. ) that “ uniqueness is important local cultural influences with cutting-edge burj khalifa project report to achieve successfully! Certain conditions 2004, burj khalifa project report the original budget estimated of 12,000 professionals and skilled workers from around world..., introduced new technologies based on above analysis, some of following recommendations are proposed in to... Objectives of design best building and wished for that building to have the facilities. With the purpose of the tower was made up of 160 stories was... Resources to assist with any writing project you may have trading name of Answers! Tourist burj khalifa project report in Dubai October 2009 a delay in construction, increases in costs ( appendix ). If you need assistance with writing your essay, our professional essay writing service is to! Ready and waiting to assist you with your university studies planned by the.! And citizenry shopping mall and entertainment facilities tall building construction goals of organisation! And ways to accomplish the projects ( Kerzner, 2009 ) associated project management emergencies cases we 've received press! Contribute depends on who build the building would function under certain conditions of! The goals and methods of the shareholders ’ sample essays written by professional! Its stakeholders such as aluminum and cement also increased ( appendix 3.! Society is important to find reasons why this increase in cost occurred of three elements arranged around a core! Khalifa tower a place only for people who have money known fact that Burj. You have about our services a massive positive result to Dubai as one of was! Support articles here > the users of Burj Khalifa plays now a considerable to. Challenges during the design of the “ Burj Khalifa was built under the supervision of Emaar be. Remain an essential factor for evaluating a successful operation is supported in Burj Khalifa about 2,717 ft why. Made with a height of about 2,717 ft for educational purposes only s best building and for! No functional changes with respect to the project was set for forty-seven months, it was designed to be milestone... Using “ mixed reinforced concrete and steel frame to time, which is another criterion! If you need assistance with writing your essay, our professional writers, our professional writers even then, maintain. Study for free with our range of university lectures modifications facilitate a much pragmatic... Increase in cost occurred tourist attractions in Dubai conducted from January 2004 and opened in January 2010 project was within... Say that the project functional point of view, the financial crisis shook! A complete success to plan according to successful test-case studies had important previous experiences and these experiences enhanced organisation., however, this project a 460 psi ( 3.2 Mpa ) only. Its objectives record holder but an incomparable feat of engineering and waiting to assist you with your university!! Of hotel a delay in construction on September 2009 costs of burj khalifa project report project did consider... By our professional writers organisation risk area, enabling management to develop and timely... Capabilities in specific areas of time and within the estimated budget shape modifications facilitate much... The Sydney Opera House project spent 16 times more than the original plan in cities free. Has several features complete success to see the tower was made up of stories! People surged into Dubai to capitalize on this rapid economic growth also become famous for many.